ARM has assisted Seneca Resources Corporation (SRC) with the siting, design, drilling, testing, and/or permitting of eleven (11) high-capacity groundwater supply wells, that can provide a combined 2.5 MGD for use in hydraulic fracturing and natural gas well development. Additional work has included the development and implementation of a well rehabilitation program to address wells with heavy iron precipitation and biofouling.
These wells are used in conjunction with recycled produced fluids to meet SRC’s water supply demand in the Clermont development area.