ARM has assisted the Greenfield Township Municipal Authority (GTMA) with the development of a 350 gpm (~0.5 MGD) groundwater supply well drilled and constructed in the Ridgeley Sandstone Member of the Old Port Formation.
State-of-the-art Water Withdrawal
Groundwater Supply Well
Groundwater Supply Development
Identification of Township Water Supply
PublIc Water Supply Well Decommissioning