Seneca Resources Company Water Supply

Various Locations, Pennsylvania

ARM was challenged with providing the water needed for well completion activities –approximately 4.5 million gallons per well–to Seneca’s operations with less than ideal road conditions. Seneca projected approximately 70,000 truck trips on roads built for lighter traffic. The solution developed by ARM was to pipe the water from a water withdrawal pumping facility at the base of the mountain on Lycoming Creek.   


Project Highlights

  • Site characterization and successful Act 2 remediation on eight separate sites
  • Phase I/II Environmental Site Assessments
  • Collected & analyzed hundreds of soil and groundwater samples
  • Successfully obtained water withdrawal permits from the Susquehanna River Basin Commission (SRBC)
  • Supported geologic investigation & reporting for underground injection control (UIC) wells
  • Successfully obtained a highway occupancy permit (HOP) from the Pennsylvania Department of Transportation (PennDOT) for a horizontal boring
  • Successfully obtained Encroachment Permits for stream crossings
  • Provided construction quality assurance (CQA) for the construction of the pumping station and pipelines
  • Provided QA/QC for analytical reports
  • Met the challenge of developing 1-million gallons per day for energy development projects by utilizing ARM’s hydrogeology and geophysics expertise; discovered and developed over 2-million gallons per day