ARM completed and permitted a value engineering re-design of the previously permitted mechanically stabilized earth (MSE) berm at the Atlantic County Utilities Authority (ACUA) Landfill to optimize the capacity of the site and reduce construction costs associated with the MSE berm.
ARM’s value engineered design reduced construction costs of the MSE berm by approximately $4.4 million