Final Reclamation Plan

ARM prepared an application to PA DEP to change the final reclamation plan for a 42-acre quarry located in Southeastern PA. The Major Permit Modification allows the quarry operator to accept material meeting the Reclamation Fill standards to reclaim the site back to pre-mining conditions. The change to the final reclamation plan will allow for future development of the site. 

Project Details
• Major Modification to Large Noncoal Surface Mine Permit
• Development of Groundwater and Surface Water Monitoring Program
• Development of Reclamation Fill Plan
• Development of Material Acceptance Plan
• Reclamation Design and Planning