ARM was tasked by a confidential client to identify the location of the lake drain pipe reportedly located along the middle of the dam, identifying potential underground karst voids and sinkholes, identifing the depth to bedrock, and identifing if there are indications of water seepage occurring within the dam or abutments.
Dam Evaluations and Modifications